Waterproof Dog Training Leash 50FT 30FT 15FT 10FT 5FT Heavy Duty Recall Long Lead for Large Medium Small Dogs (15FT, Mint Green)
$21.58
Taxes will be calculated at Checkout.US Delivery Time: 3-5 Business Days.
- - Brand: NIMBLE
- - SKU: ADIB0B24W1L3W
- - UPC: 755749848955
- Only 8 left in stock - Order Now.
Waterproof Dog Training Leash 50FT 30FT 15FT 10FT 5FT Heavy Duty Recall Long Lead for Large Medium Small Dogs (15FT, Mint Green)
Waterproof Dog Training Leash 50FT 30FT 15FT 10FT 5FT Heavy Duty Recall Long Lead for Large Medium Small Dogs (15FT, Mint Green)Features of Waterproof Dog Training Leash 50FT 30FT 15FT 10FT 5FT Heavy Duty Recall Long Lead for Large Medium Small Dogs (15FT, Mint Green)
Waterproof Dog Training Leash 50FT 30FT 15FT 10FT 5FT Heavy Duty Recall Long Lead for Large Medium Small Dogs (15FT, Mint Green)Features
Waterproof Dog Training Leash 50FT 30FT 15FT 10FT 5FT Heavy Duty Recall Long Lead for Large Medium Small Dogs (15FT, Mint Green)Specification
Product Detail | |
---|---|
Brand | NIMBLE |
Color | Mint Green |
Size | 15FT |
Dimensions | 5.91X5.43X0.79 |
Warning - California Proposition 65
This product may contain chemicals known to the State of California to cause cancer, birth defects, or other reproductive harm.