index

Luffwell Runner For Yard, 200Ft Long Lead With 10Ft Pulley Tie Out Cable For Heavy Duty Dogs Up To 250Lbs, Trolley System For La

  • Regular price $70.93
  • Will be in stock after

Shipping calculated at checkout


Hurrify, 0 item(s) left in stock!

Join Waitlist
Wishlist

Vendor: Luffwell

Type: Training & Behavior

Sku: WBPETB0DPJPGVD2

Available: Sold Out

Sold by Petocart, an authorized reseller.

Returns accepted within 30 days  |  support@petocart.com

✓ Verified
Shipping Information
  • Shipping calculated at checkout
  • Processing Time: 3-5 business days
  • Estimated Delivery: 6-10 business days
  • Safely packaged to keep your pet's products fresh & intact
  • Tracking number sent via email once dispatched
  • Orders over $250 require signature upon delivery. Taxes calculated at checkout.
Returns & Refund

Returns accepted within 30 days of delivery.

Damaged or Defective Item

Free return shipping + replacement or full refund

Wrong Item Received

Free return shipping + replacement or full refund

Change of Mind

Return shipping at customer's expense · Restocking fee may apply

All returns require a Return Authorization (RA) number before sending.

To initiate a return, contact us:

support@petocart.com +1 281-738-1130
View Full Return & Refund Policy
Safety & Compliance
⚠️

California Proposition 65 Warning

Some products sold on this website may expose you to chemicals known to the State of California to cause cancer, birth defects, or other reproductive harm.

www.P65Warnings.ca.gov
🐾

Pet Safety Advisory

Consult your veterinarian before use if your pet has a known medical condition, is pregnant, nursing, or is on medication.

Keep out of reach of children. For animal use only.

ℹ️

Product Usage Notice

Always read labels, directions, and ingredient lists before use. Discontinue use and contact your vet if your pet shows signs of adverse reaction.

Guarantee safe checkout

Luffwell Runner For Yard, 200Ft Long Lead With 10Ft Pulley Tie Out Cable For Heavy Duty Dogs Up To 250Lbs, Trolley System For La

$70.93

Frequently Asked Questions

  • Q: What is the length of the dog runner system? A: The dog runner system is two hundred feet long, providing ample space for your dog to roam freely.
  • Q: What materials are used in this dog trolley system? A: The dog trolley system features galvanized steel and aviation aluminum, ensuring durability and resistance to rust.
  • Q: What colors are available for this dog runner? A: The dog runner is available in an ice blue color, providing a stylish look for outdoor activities.
  • Q: How do I install the LUFFWELL dog trolley system? A: The trolley system is easy to install and comes with detailed instructions and all necessary components included.
  • Q: Is this dog runner suitable for large dogs? A: Yes, this dog runner is designed for dogs up to two hundred fifty pounds, making it ideal for large breeds.
  • Q: How long is the tie-out cable that comes with the system? A: The tie-out cable included in the system is ten feet long, allowing for flexibility in your dog's movement.
  • Q: What should I do to maintain this dog runner system? A: To keep the dog runner in good condition, clean it regularly and check for wear and tear on the cable and clips.
  • Q: Is the dog runner system weatherproof? A: Yes, the galvanized steel leash is coated with a weatherproof chrome-plated finish to prevent rust and corrosion.
  • Q: Can I use this system for camping trips? A: Yes, this dog runner system is perfect for camping trips, allowing your dog to enjoy the outdoors while remaining secure.
  • Q: What if the dog runner arrives damaged? A: If the dog runner arrives damaged, please contact customer support for assistance with returns or replacements.
  • Q: Does the dog runner system come with a warranty? A: Yes, the LUFFWELL dog trolley system typically includes a warranty; please check the product details for specifics.
  • Q: How can I prevent my dog from tangling while using this system? A: The system features a 360-degree swivel collar clip that helps prevent tangling, allowing for smooth movement.
  • Q: Is the shock-absorbing feature effective? A: Yes, the shock-absorbing spring helps reduce tension and prevents injury during sudden movements or pulls.
  • Q: Can this dog runner be used in urban areas? A: Yes, this dog runner is suitable for urban areas as long as there is enough space for the dog to move without hazards.
  • Q: What components are included in the package? A: The package includes one aerial tie-out cable with a pulley, one runner line, two stoppers, and necessary hooks and clamps.

Recently viewed