index

Waterproof Dog Training Leash 50Ft 30Ft 15Ft 10Ft 5Ft Heavy Duty Recall Long Lead For Large Medium Small Dogs (30Ft, Pink)

  • $25.92
  • Regular price $37.03
Promo IconWELCOME5: Use Code WELCOME5 for 5% OFF on your first order!

Hurrify, 10 item(s) left in stock!

Join Waitlist
Wishlist
Customer Love Badge
Loved by +2,002 customers   
Profile 1 Profile 2 Profile 3 Profile 4

Vendor: NIMBLE

Type: Training & Behavior

Sku: WBPETB085ZRXGLP

Available: Available

- No EU import duties.
- Ships within 1-2 business days.
- Ships in our fully recyclable and biodegradable signature boxes.

  ⚠️ California Proposition 65 Warning :
   Some products sold on this website may expose you to chemicals known to the State of California to cause cancer, birth defects, or other reproductive harm.  

For more information, visit     www.P65Warnings.ca.gov.  

Guarantee safe checkout

Waterproof Dog Training Leash 50Ft 30Ft 15Ft 10Ft 5Ft Heavy Duty Recall Long Lead For Large Medium Small Dogs (30Ft, Pink)

$25.92

Frequently Asked Questions

  • Q: What sizes are available for the Waterproof Dog Training Leash? A: The Waterproof Dog Training Leash is available in multiple sizes including 5FT, 10FT, 15FT, 30FT, and 50FT, allowing you to choose the perfect length for your dog's needs.
  • Q: Is the leash suitable for all weather conditions? A: Yes, the leash is crafted from PVC coated nylon webbing, making it weatherproof and durable. It's designed to withstand various weather conditions while remaining lightweight and easy to clean.
  • Q: How strong is the Waterproof Dog Training Leash? A: The leash is designed with a remarkable pull force resistance of up to 600 lbs, ensuring safety and reliability for dogs of all sizes during training and outdoor activities.
  • Q: Can this leash be used for training and outdoor activities? A: Absolutely! This leash is ideal for training, hiking, camping, and beach play, helping to enhance your dog's recall skills and providing a reliable connection during adventures.
  • Q: What materials are used in the construction of the leash? A: The leash is made from high-quality nylon material, which is not only strong but also soft, ensuring comfort for both you and your dog during use.

Recently viewed